INSTRUCTION FOR USING QUARTZ SLABS
1- Check the slab delivered to you to make sure that design and shade is as per your order.
2- Take care to ensure that slabs are not rolled, thrown or hit during transportation.
3- Slabs to be stored under covered area, with full support at the back, away from direct sunlight.
4- Always use cutting board fr cutting and chopping slabs.
5- Slab installation to be done using modified adhesive or PU based adhesive only.
6- Before fixing on the concrete floor ensure that the surface is clean and levelled.
7- Avoid using POP (Plaster of Paris) on the surface of the slabs.
8- Also refrain from using acid or alkaline detergents. These can permanently damage the slab surface.
9- Use only natural stone cleaner/acetone on stains.
10- Use insulating pad when placing hot objects on slab.
11- Remove the lamination sheet immediately after 24 hours of installing the slabs. (flooring/wall cladding or counter top.